Télécharger Imprimer la page

VMB TE-06 Mode D'emploi page 8

Pied élévateur

Publicité

Les langues disponibles

Les langues disponibles

Operating instructions
3.2 - Verify that the legs are inserted and tightly
fastened by the safety catches (R).
3.3 - Verify that the tower is in a vertical position
by means of the spirit level (F) placed in the
base. Adjust, if necessary, with the disc feet
supports (Q), rotating the hand crank (H).
3.4 - Verify that the elevator tower is blocked in
the working position by means of the safety
catches (M1, M2).
3.5 - To use the tower in the open air, place the
tower in terra firma and protect it against the
wind action.
3.6 - Do not use stairways neither over the
tower nor leaned in it.
3.7 - Be careful with cables, prominent objects,
etc. placed above the tower.
3.8 - Do not stay under the load.
3.9 - Do not move the tower when it is lifted with
load.
3.10 - Before any use of the tower verify the
cable, this must be free of cuts and fraying. Do
not use cables in bad conditions.
3.11 - Never take to pieces the hand cranck of
the winch (W) if the tower is lifted with load.
3.12 - The minimum load required for a perfect
braking function is 25 Kg. The brake will not
function without this minimum load.
3.13 - Do not apply oil or grease to the brake
mechanism.
3.14 - Not approved for lifting persons.
3.15 - For the transport, lower all the sections
and blockade them with their safety catches.
VMB ESPAÑOLA, S.A.
ENGLISH
4. Operation.
4.1 - In order to place the elevator tower in their
working location, put the tower on a hard and
level surface.
4.2 - Get on the legs (P) of their support for the
transport (S) and insert them in their working
lodging (V) verifying that they are tightly fastened
by the safety catches (R).
4.3 - Adjust the vertical position of the tower by
means of the disc feet supports (Q) rotating the
hand crank (H) in the necessary direction to
manage that the bubble of the spirit level (F)
stays centred in the circle.
4.4 - Put the load on top of the tower using the
suitable support, in order to make work the
weight of the load only in the vertical direction.
The minimum load must be 25 Kg.
4.5 - Lifting:
Lift the blockade on the safety catch (M1)
and elevate the tower rotating the hand crank
of the winch (W) in a clockwise (N
load and getting completely out the first profile.
4.6 - Stopping:
Release the hand crank of the winch (W),
it will keep that position by means of the
automatic brake activated by the load. Blockade
this first profile with the safety catch (M1) fixing
it to the second profile.
4.7 - To continue lifting:
Rotate again the hand crank of the winch
(W) in a clockwise, lifting the load until to get out
completely the second profile. Release the
hand crank, wich will be fixed by the automatic
brake, and blockade the second and third
profiles, with the safety catch (M2).
www.audiovias.com
v6.09 - Depósito legal y Copyright 2006. Todos los derechos reservados.
-
), lifting the
1

Publicité

loading