ASSEMBLY STEP 2
HARDWARE FOR STEP 2 :
BOLT (B)
20 mm
Qty: 4
RUNNING DECK
LEFT
CONSOLE
MAST
FLAT WASHERS (D)
SPRING WASHERS (C)
BOLTS (B)
SPRING WASHER (C)
FLAT WASHER (D)
15 mm
15 mm
Qty: 4
Qty: 4
FOOT LATCH
BASE FRAME
Open HARDWARE FOR STEP 2.
A
With the RUNNING DECK in the raised
B
position, attach the LEFT CONSOLE MAST
to the BASE FRAME using 4 BOLTS (B),
4 SPRING WASHERS (C) and 4 FLAT
WASHERS (D).
11