Cable Entry - SMA SUNNY HIGHPOWER PEAK1 SHP75-10 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2  Installation
7. All conductors must be correctly attached with the
correct torque. See Section 5.4, page 43.
Figure 2.17 Protective conductor symbol
LEAKAGE CURRENT HAZARD
Insufficient grounding of the inverter can lead to serious
injuries or lethal injuries.
• Ensure the correct grounding of the devices by a
certified electrical installer.
Terminal
AC+PE
PV
Table 2.1 Suitable conductor sizes
1)
Always observe the ampacity of cables used.
26
SHP75-10-IA-xx-15
1)
Range
35 to 150 mm²
35 to 150 mm²

2.7 Cable Entry

The mounting brackets for the cable glands are already
pre-mounted.
Figure 2.18 AC cable gland
Figure 2.19 DC cable gland
Conductor material
Al/Cu
Al/Cu
SMA Solar Technology AG
Cable sheath diameter with supplied
cable gland
46 to 53 mm
18 to 25 mm
Installation Guide

Publicité

Table des Matières

Dépannage

loading

Table des Matières