Assembly And Operation - Metabo HPT DV 18DGL Instructions De Sécurité Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
2. Battery Charger
Model
Input power source
Charging time
(At a temperature of 68°F (20°C))
Charging voltage
Charging current
Weight
NOTE: The charging time may vary according to temperature and power source voltage.
APPLICATIONS
○ Drilling of brick and concrete block, etc.
○ Driving and removing of machine screws, wood
screws, tapping screws, etc.
○ Drilling of various metals
○ Drilling of various woods
REMOVAL AND INSTALLATION METHOD
OF BATTERY
1. Battery removal
Hold the handle tightly and push the battery latch to
remove the battery (See Fig. 3).
CAUTION
Never short-circuit the battery.
2. Battery installation
Insert the battery while observing its polarities (See
Fig. 3).
Insert
Pull out
Battery
10

ASSEMBLY AND OPERATION

Handle
Latch
Push
Fig. 3
UC18YKSL
Single phase: AC 120 V 60 Hz
BSL1815S: Approx. 35 min
BSL1815: Approx. 40 min
BSL1830C: Approx. 90 min
DC 14.4 V – 18 V
DC 2.0 A
0.8 lbs. (0.35 kg)
CHARGING METHOD
NOTE
Before plugging into the receptacle, make sure the
following points.
○ The power source voltage is stated on the
nameplate.
○ The cord is not damaged.
WARNING
Do not charge at voltage higher than indicated
on the nameplate.
If charged at voltage higher than indicated on the
nameplate, the charger will burn up.
1. Connect the charger's power cord to a receptacle.
When the power cord is connected, the charger's pilot
lamp will blink in red. (At 1-second intervals)
WARNING
Do not use the electrical cord
if damaged. Have it repaired
immediately.
2. Insert the battery to the battery charger.
Firmly insert the battery into the charger as shown in
Fig. 4.

Publicité

Table des Matières
loading

Table des Matières