Télécharger Imprimer la page

innovair MCO09H2BHRA Manuel D'installation page 36

Publicité

Install the control box cover and turn the
circuit breaker to ON, then close the two plastic
covers on both sides of the panel.
During the test-run process, the display will be
lighted and the air griller will rise automatically.
Model B
Press the circular position to open the two screw
covers, then remove the two screws.
Hold and open the air grille, then push both of the
latch to the middle to unlock the air grille.
Pull the panel grille out of the panel, x the
cassette panel to the one-way cassette by two
plastic buckles.
©2024 Innovair Solutions. All Rights Reserved.
Screw Covers
Latch
Manually rotate the air de ector, x the panel
to the cassette by using 3×M4*22 screws and a
ST3.9*16 screw.
M4*22 screw
NOTE:
Eight M4*22 screws are supplied,
two of which are spare. Two
ST3.9*16 screws are supplied, one
of which is spare.
Before xing this screw, you need to open the screw
cover; and after xing screw, please close the cover.
Open the two covers on both sides of the panel,
x the panel to the cassette by using 3× M4*22
screws.
Connect the display board to the main control
board, up to four wires are required to connect.
NOTE: The corresponding colors or corresponding
pins are connected each other.
CN10
(white 10-core)
CN55
(red 5-core)
when connection is completed, please
clip the wires to the buckle.
34
palstic buckle
ST3.9*16 screw
M4*22 screw
CN14
(white 5-core)
Wireless
CN38
(4 core)
www.innovair.com

Publicité

loading

Produits Connexes pour innovair MCO09H2BHRA

Ce manuel est également adapté pour:

Mco18h2bhraMos09h2bm0aMos09h2bh0aMos18h2bm0aMos18h2bh0a