Télécharger Imprimer la page

innovair MCO09H2BHRA Manuel D'installation page 14

Publicité

Install Your Indoor Unit
1
Select installation location
NOTE
Before installing the indoor unit, you must choose an appropriate location. The following are
standards that will help you choose an appropriate location for the unit.
Before Installation:
• Determine the route to move the unit to the installation site.
• First unseal and unpack the unit. Then, hold the seats of the hanger (4 pcs) to move the unit. Refrain from
exerting force on other parts of the unit, especially the refrigerant piping, water discharge piping, and the
plastic parts.
Proper installation locations meet the following standards:
Enough room exists for
installation and maintenance.
The air inlet and outlet
are not blocked.
DO NOT install unit in the following locations:
Areas with oil drilling or fracking
Coastal areas with high salt content in the air
Areas with caustic gases in the air, such as
hot springs
Areas that experience power uctuations, such
as factories
©2024 Innovair Solutions. All Rights Reserved.
Enough room exists for the
connecting the pipe and drainpipe.
The air ow can ll
the entire room.
12
There is no direct radiation
from heaters.
The ceiling is horizontal and its structure can
sustain the weight of the indoor unit.
Enclosed spaces, such as cabinets
Kitchens that use natural gas
Areas with strong electromagnetic waves
Areas that store ammable materials or gas
Rooms with high humidity, such as
bathrooms or laundry rooms
www.innovair.com

Publicité

loading

Produits Connexes pour innovair MCO09H2BHRA

Ce manuel est également adapté pour:

Mco18h2bhraMos09h2bm0aMos09h2bh0aMos18h2bm0aMos18h2bh0a