4
Installation Procedure
Preparation for Installation
Preparation for Installation
The controller is supplied in a special protective packing. If this
shows signs of damage which may have occurred during transport,
contact your local sales office. When unpacking the controller, be
sure not to drop it and avoid any kind of sudden impact or shock
vibration to it.
Do not dispose of the packing materials in an unauthorized manner.
The material is 100 % recyclable and complies with EEC Directive
85/399.
Figure 1
60/104
Packing
Ion Pumps Control Unit User Manual / 87-900-124-01
(C)