template corresponds to front of the hood
and consequently to side where control
panels will be located at the end of
installation)
b. Remove and save template. Cut and
remove ceiling drywall. Install suitable
length 2" x 4" lumber between joists to
provide support bracket mounting points
as shown above. Use template for
dimensions and required clearance.
Make sure to affix the added lumber
firmly and level. Consult a professional if
you have difficulties or your installation is
unique. Consult template and Figs.above.
c. Install drywall; then refinish ceiling.
Determine the required position for the
conduit and cut a 1-1/4" (3.2 cm) hole at
this location.
Run wires through hole according the
National Electrical Code or CSA
Standards and local codes and
ordinances.
d. Tape Template in place and mount the
support bracket with wood screws
(Supplied in mounting hardware kit) on
locations marked on template, then
remove template.
3. Prepare the support bracket, suitably
adjusting the length of the cables
according to the following formula:
L = X-Y-H+1" 3/16
L = truss extension
X = distance between the ceiling and the
bottom edge of the hood
After finding the right length, secure the
cables, tightening the lock nuts with a
spanner.
4. Apply the support bracket on the ceiling,
passing the cables for the electrical
connection through the middle hole.
Fix with 3 wood screws.
5. Install the aesthetic cover brackets and
lock with 6 screws.
11