Fig. 9
A
B
C
D
C
D
•
Secure the top bracket (Fig. 9A) to the upper u-channels with
two screws.
Attach the front bracket (Fig. 9B) to the middle u-channel
•
with two screws.
Secure the bottom bracket (Fig. 9C) to the front bracket (Fig. 9B)
•
and bottom bracket (Fig. 8F) with three screws.
Screw the height adjuster (Fig. 9D) in the front bracket (Fig. 9B).
•
Place the sliding rails (Fig. E)
•
All manuals and user guides at all-guides.com
E
Fig. 10
B
12 mm
C
25 mm
A
Fig. 11
C
B
C
Fasten all the soapstones to the u-channels with nuts (B) and
•
wing nuts (C).
•
Secure the soapstone to the frame (not too hard).
ENGLISH
B
60 mm
A
70 mm
B
60 mm
A
70 mm
B
A
27