Télécharger Imprimer la page

Cristec CPS2 OEM 12V/25A Manuel D'utilisation page 19

Publicité

3.2.6 Indicators
INDICATOR
Green "ON"
Yellow "Boost/Floating"
These indicators are visible from the front of the appliance through the light guides, thereby allowing operation of the
appliance to be monitored.
4
INSTALLATION
This paragraph deals with installation-related arrangements.
Installation and initial commissioning should be carried out by an electrician or professional installer in
accordance with the standards currently in force (for pleasure boats the applicable international standard is
ISO13297).
The installer should familiarize himself with this operating manual and inform users of the instructions for use
and the safety warnings set out in paragraph 5.
4.1
SITING THE CHARGER
The CPS2 OEM 12V/25A charger should be installed as near as possible to the batteries in a dry, well-ventilated
and fully damp-proof and dust-free room. Air circulation should be unhindered.
The recommendations specified in paragraph 1 must be adhered to. It is imperative that the charger is placed
vertically (cable lead-in at the bottom).
The charger is fixed using 4 round M5 screws (screw-head diameter under 10mm so as not to hamper the
opening of the hood).
Fixing centre distance: see corresponding drawing in the appendix.
4.2
WIRING
4.2.1 Cable lead-in
When connecting or disconnecting a cable, the charger's power supply must be off and the batteries electrically
insulated from the charger.
The AC input must be imperatively done on a WAGO connector, type WINSTA, reference 770-103 (not
supplied). The charger is equipped with a WAGO terminal, type WINSTA, reference 770-813.
Connect Phase on "L", Neutral on "N" and Earth on the symbol earth. The Earth terminal must be imperatively
connected before any of the other terminals.
The battery and/or use outputs must be imperatively done on a PHOENIX CONTACT connector, reference PC
6/4-STF-10,16 (not supplied). The charger is equipped with a PHOENIX CONTACT terminal, reference PC 6/4-
GF-10,16.
Connect from left to right : -BAT, +BAT D, + BAT1 and BAT2.
The minimal cross-section of the power cable must be at least equal to 3 x 1,5mm².
The cross-section of the battery cables must be bounded by 6 and 10mm².
The rating of the upstream circuit-breakers should match the equipment's requirements.
The installer should choose the types of cable (H07-VK, MX...) according to the type of application and the
applicable standards.
CPS2OEM25ADEB.doc
All manuals and user guides at all-guides.com
STATE
On
Off
On
Flashing
Off
MEANING
- Charger is ON
- No or poor quality AC current
- Input fuse blown
or
- Internal charger malfunction
or
- SW1 Switch : Boost in OFF position
or
- SW1 switch : Boost in ON position and
Boost/Absorption phase completed
- SW1 Switch : Boost in ON position and
charger in the Boost/Absorption phase
- Internal charger malfunction
or
- Output fuse blown
19

Publicité

loading