Télécharger Imprimer la page

Monogram ZV755 Instructions D'installation page 9

Masquer les pouces Voir aussi pour ZV755:

Publicité

INSTALLATION – VENTED TO THE OUTSIDE
DUCTWORK, WIRING LOCATIONS
■ Determine the exact location of the vent hood.
■ Locate the template packed with the literature.
–Measure 36" from the floor to the top of the
cooking surface. Add hood installation height
determined on page 8. Mark that location.
–Use a level to draw a straight pencil line on the
wall.
–Tape the template in position along the penciled
line. CHECK TO BE SURE THE TEMPLATE IS
LEVEL.
3-3/4" c enterline to wall
• Drill 1/8" Pilot Holes For Mounting Brackets.
• Drill 1/8" Pilot Holes.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
■ Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
■ Measure 3-3/4" from the back wall to the centerline
of an 6-1/2" hole on the ceiling.
NOTE: If drywall is not present, add drywall thickness
to the 3-3/4" dimension.
Wall Ducting:
If ductwork will vent to the rear:
■ Use a level to draw a line straight up from the
centerline on the template.
■ Measure at least 6" above the bracket location shown
on the template to the centerline of a 6-1/2"-dia. duct
hole. (Hole may be elongated for duct elbow.)
HOUSE WIRING LOCATION:
■ The junction box is located on the top left side of the
hood.
■ Wiring can enter from the back wall or ceiling above
the top bracket location. Route additional wiring
length to reach the junction box.
31-10724-7
Installation Instructions
FOR CEILING VENT
DUCTING
FOR WALL
VENT DUCT
Centerline 6" min. above
bracket location
5-7/8"
17-5/16"
C L
• Drill 1/8" Pilot Holes.
Align edge 25-1/2" above Cooking Surface.
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: The vent hood must be secured to
rear support framing or a wall stud. Framing must be
capable of supporting 100 lbs.
6-1/2" min. opening for ductwork
Centerline of
installation
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
■ Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
■ Install a horizontal support at least 1" x 12" between
two wall studs at the mounting screw location. The
horizontal support must be flush with the room
side of the studs. Use cleats behind both sides of
the support to secure to wall studs.
IMPORTANT: Reinstall drywall for an even mounting
surface.
View from
rear cleats
1" x 12" min.
mounting
support
space
NOTE: 2 horizontal supports
will be needed if there is a
stud located between the
horizontal screw locations.
9

Publicité

loading

Ce manuel est également adapté pour:

Zv750Zv750spss