Installing the Control Box

Use the following procedure to install the control box.
NOTE: Units can be ordered with up to ten feet (3 m) of wire
leads, depending on the installation location of the
control box.
WARNING
Control box must be mounted in a vertical surface.
Mounting control box in a horizontal surface may result in
the collection of liquids and lead to electric shock.
NOTICE
Install remote-mounted control box outside of heat zone.
Locating control box inside heat zone will cause control(s)
to overheat, malfunction, and fail.
IMPORTANT NOTE:
Remote-mounted control boxes must be installed in a cool,
dry location as far away from any heat zone as possible. Do
not mount control boxes directly on, under, or above unit. Do
not mount control boxes in direct contact with any heated
surface or near any steam generating equipment.
1. Make the appropriate cutout in the vertical surface where
the control box will be installed. Refer to the illustration
below for cutout dimensions.
NOTE: Make sure a minimum depth of 5-1/4" (133 mm) is
available behind the vertical surface for the depth of
the control box and wires.
Silicone Sealant
7/16"
(11 mm)
3/8"
(9 mm)
8-1/8"
(206 mm)
Max.
Control Box Cutout and Screw Hole Dimensions
NOTE: Make sure the width of the control box cutout does not
exceed the above dimension.
2. Complete the routing of the wire leads from the unit to
meet up with the wire leads on the control box.
3. Route the wire leads from the power supply to meet up
with the wire leads on the control box.
3-7/8"
(98 mm)
8-7/16"
(214 mm)
4. Remove the four trim cover screws from the control box,
and remove the trim cover.
5. Make the electrical connections between the unit and the
control box. Refer to the wiring diagram included with the
unit.
6. Make the electrical connections between the control box
and the power supply. Refer to the wiring diagram included
with the unit.
7. Install the control box in the cutout. Make sure the wiring
on the back of control box is not pinched during installation.
8. Fasten the control box to the vertical surface using four
screws (not supplied).
9. Apply a 1/4" (6 mm) bead of NSF-approved silicone sealant
where the trim cover will contact the cabinet surface. Refer
to the "Control Box Cutout and Screw Hole Dimensions"
illustration for more information.
10. Reinstall the trim cover on the control box and secure in
position using the four trim cover screws.
7/16"
(11 mm)
3"
(76 mm)
8
Control Box
Trim Cover Screw
Installing the Control Box
Form No. GRN4M-1017
English
Heat
Control
Box
Cutout
Trim Cover