Télécharger Imprimer la page

Siemens WS 6 Serie Mode D'emploi Et Instructions De Montage page 14

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
Current values "LOOP 1"
Current value
Current flow
Current heat power
Alternate current tempera-
ture hot and cold side in 2
s cycles
Temperature difference
Previous month's values "LOOP 2"
Previous month's values
Log date
Energy quantity on set
day
Cooling registers on set
day (optional)
Volume on set day
Missing time on set day
Max. flow on set day in 2
s cycles with date stamp
General/Communication "LOOP 3"
General/Communication
Device number,
7-digit
Optional interface
Primary address (only for
M-Bus)
Secondary address
7-digit - for M-Bus
Other "LOOP 4"
Other
Date
Time
4.1
Monthly values
The meter stores the following values for 24 months on the
monthly set day
Missing time
Volume
Energy
and the maxima with date stamp for
Flow
Power
Temperature hot side
Temperature cold side
Smart Infrastructure
4.2
When the LCD displays the code input, you can access the
parameterization operation by entering the code. You can set
Mounting place here:
date and M-Bus primary address in the parameterization oper-
hot side, changeable;
ation for example. For more detail see the separate parameter-
optional)
ization instruction.
Operating time with flow
5.
Operating time with flow
For activation proceed as follows:
Time with flow
The message "F0" disappears after 10 sec.
Max. power in 2 s
cycles with date
stamp
Max. temperature hot
side in 2 s cycles with
date stamp
Max. temperature cold
Error messages for incorrect installation:
side in 2 s cycles with
date stamp
Yearly set day
Monthly set day
Firmware version
6.
CRC-Code
If the respective operation thresholds are exceeded and flow
and temperature difference are positive, the meter summates
the energy and the volume.
For a positive flow the activity display
Code entry for test /
loop in the LCD.
para operation
All segments of the display are switched on for control purpos-
es during the segment test. The flow, power and temperature
difference are recorded with the appropriate +/- signs.
The operating hours are counted from the first connection of
the power supply. The meter saves "operating time with flow"
as soon as a positive flow is recognized. Missing hours are
summated if there is a fault and the meter is thus unable to
take a measurement.
Stored maximum values are marked with an „
right hand area of the LCD.
A6V11285667_----_d
Parameterization
Getting started
Open the slide valves slowly.
Check the heating system for leak-tightness.
Vent the heating system carefully.
Press the button on the meter briefly.
Check the measured values for flow and temperatures for
plausibility.
If needed vent the heating system until the flow display is
stable.
Fit the user locks to the fittings and the temperature sen-
sors. The scope of supply includes two self lock seals for
sealing a sensor and the connecting fitting.
Read the meter status for energy, volume, operation and
missing time and note the values.
Error "incorrect flow direction (negative)"
Check that the flow direction arrows on the volume measurement unit
match the flow direction of the system. If the directions do not match,
turn the volume measurement unit by 180°.
Error "negative temperature difference"
Check whether the sensors are installed in the right circular flow (flow
and return flow interchanged). Use only a meter suitable to the mount-
ing place.
Heat meter:
Temperature sensor in the flow-pipe with higher temperatures; temper-
ature sensor in return-pipe with lower temperature
Cooling meter:
Temperature sensor in the flow-pipe with lower temperatures; tempera-
ture sensor in return-pipe with higher temperature
Functional details
If the operate margin is gone below a "u" is displayed at a leading
point for the flow, power and temperature display.
appears in the user
"in the lower
2021-07-28
12

Publicité

loading