(1) REMOVE ALL NAILS AND BATTERY FROM
NAILER.
□ ALL SCREWS MUST BE TIGHTENED.
□ THE PUSH LEVER AND TRIGGER MUST MOVE
SMOOTHLY with pulling back the feeder knob.
Trigger
Push lever
(2) Installing the battery.
Do not operate the push lever or trigger while
installing the battery.
Latch
(3) Turn on the Power switch.
Power
Power indicator
switch
Battery indicator
switch
Battery indicator
Feeder knob
Handle
Battery
Push
Pull out
Insert
Nailing operation
indicator
Nailing operation switch
Turn on the Power switch by push and hold on Power
switch more than 1 second.
Make sure the power indicator is lighting in green,
and nailing operation indicator is lighting in blue.
(FULL SEQUENTIAL ACTUATION MECHANISM,)
NOTE
● Do not press the push lever and/or pull the trigger
during the process of turning the power switch ON.
Doing so will prevent the power switch from turning
ON.
Light in green
[Auto power off ]
When the power is turned on but the Nailer is not
used for 30 minutes, the Nailer is automatically
turned off . To turn on again, press the power
switch.
Never leave the Nailer with the power on. This
could result in an accident.
Nailing operation indicator
● Lighting (Blue):
FULL SEQUENTIAL ACTUATION MECHANISM,
● Blinking (Blue):
CONTACT ACTUATION MECHANISM
Make sure the battery indicator is not blinking.
If the battery indicator is blinking in red, the battery
doesn't have enough power and it needs to be
charged.
(4) Remove the fi nger from the trigger and press the
push lever against the workpiece with pulling back
the feeder knob.
□ THE NAILER MUST NOT OPERATE.
English
Light in blue
WARNING
21