Télécharger Imprimer la page

Pit Boss PB1100PS1 Mode D'emploi page 7

Publicité

Les langues disponibles

Les langues disponibles

Parts are located throughout the shipping carton, including underneath the grill. Inspect the grill, parts, and hardware blister
pack after removing from the protective shipping carton. Discard all packaging materials from inside and outside of the grill
before assembly, then review and inspect all parts by referencing the parts list. If any part is missing or damaged, do not attempt
to assemble. Shipping damage is not covered under warranty. Contact your dealer or Pit Boss Customer Service for parts: Monday
through Sunday, 4am - 8pm PST (EN/FR/ES).
service@pitboss-grills.com | Toll-Free: 1-877-303-3134 | Toll-Free Fax: 1-877-303-3135
IMPORTANT: To ease installation and avoid injury, use two people when assembling this appliance.
Tools required for assembly: screwdriver and level. Tools not included.
IMPORTANT: It is advised to read each step entirely before starting assembly on instructions. Do not tighten screws
completely until all screws for that step have been installed. Hardware combination involving a locking washer and
washer should be installed with the locking washer closest to the head of the screw.
1. MOUNTING THE LEGS TO MAIN BARREL
Parts Required:
1
x
Main Barrel / Hopper Assembly (#10)
Support Leg for Caster (#16)
2
x
Support Leg (#17)
2
x
12 x
Screw (#A)
12 x
Locking Washer (#C)
12 x
Washer (#B)
Installation:
Place a piece of cardboard on the floor to prevent scratching the unit.
Lay the main barrel on its side, hopper end pointed upward, on the
cardboard.
Mount one support leg (#17) to the floor end of the main barrel using
three screws, locking washers, and washers, through the three pre-drilled
holes. Install screws from the inside of the main barrel. Repeat installation
for second support leg. Note illustration 1A.
Mount one support leg for caster (#16) to the hopper end of the main
barrel using three screws, locking washers, and washers, through the
three pre-drilled holes. Install screws from the inside of the main barrel.
Repeat installation for second support leg for caster. Note illustration 1B.
NOTE: Fasten screws of the support legs only half-way to allow easier
installation of bottom shelf in next step.
ASSEMBLY PREPARATION
ASSEMBLY INSTRUCTIONS
1A
A
C
B
17-2
17-1
1B
16-2
16-1
B
A
C
7

Publicité

loading

Ce manuel est également adapté pour:

Pro serie113908172760