Télécharger Imprimer la page

Costway TW10082 Instructions page 7

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
Step 4: Connecting the Trampoline Mat to the Top Rail Frame
To facilitate the assembly of the springs to the Jumping Mat(#1),
please using the Spring Tool(#9) to pull the springs during assembly.
Attach the end with narrower opening to the V-ring. Pull the Spring
Tool (#9) towards the frame and connect the wider spring opening
into the frame receiving hole. Please refer to the picture shwon.
When connecting the Springs (#8), always connect the Springs
opposite to each other to get an even result in tensioning the
Jumping Mat(#1) .
Please Note:
The even distribution of tension is a critical factor in the proper
assembly of the Jumping Mat(#1) .
If the Springs (#8) can only be inserted with the use of extensive
force, they are not inserted in the correct order and manner.
12
After completing the spring and jumping mat assembly, the trampoline
bed should look like this:
5
Step 5: Enclosure Assembly
5.1 Loop the Rope(#22) through the preformed hole of the
Enclosure(#15) bottom and fix it to the hole of the Jumping Mat(#1)
edge;
Please note: 1)Start inserting the Rope(#22) from zipper entrance
through the connecting holes of the Enclosure (#15) and net on the
Jumping Mat(#1), and before that, make sure that the side of the
Enclosure(#15) is correct.
2)Make sure the holes of the Enclosure(#15) and net on the
Jumping Mat(#1) are connected tightly.
#22
13

Publicité

loading

Ce manuel est également adapté pour:

Tw100845286341765194287