Télécharger Imprimer la page

Sime SOLIDA 3 Instructions D'installation Et D'entretien page 18

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
– Place the intermediate grids (11).
– Introduce the ring (4) and the lever (3) on
the hub (9), fixing then everything with
the washer (2) and the screw (1).
2.5
ASSEMBLY OF THE
ACCESSORIES
The closing handles for the ports and the
screw with the adjustment knob for the
blast gate damper are supplied separately,
since they could be damaged during the
transport.
Both the handles and the screws with knob
are packed in a nylon bag, introduced insi-
de the ash collection basin.
For the assembly of the handles proceed as
following (fig. 4):
– Take a handle (1), insert it in the opening
of the load port (2) and introduce the roll
(3) in the opening of the handle; block the
handle introducing the elastic split pin
(4).
– Carry out the same operation for the
handle of the ash box port.
To assemble the screw with the knob, pro-
ceed as follows (fig. 5):
– Remove the screw M8 x 60, which fixes
the air blast damper to the ash box port
and screw the screw with the bakeli-
te knob (1) on, which is supplied in the
packaging.
Place the blind nut with cap (2) at the end
of screw M 10.
– Fix lever M6 to the air blast damper (3)
placing it in a horizontal direction on the
right. The lever has an opening at its end,
where the chainlet of the thermostatic
regulator will be connected.
2.6
CASING ASSEMBLY
Assemble the shell components (fig. 6):
– Unscrew with some rotations the second
or third nut of each tie rod.
– Hook the left side (1) on the lower tie rod
and superior of the boiler and adjust the
position of the nut and locknut of the up-
per tie rod.
– Fix the lateral side in blocking the
locknut.
– In order to assembly the right side (2)
proceed in the same way.
– Hook the front upper board (3) intro-
ducing the two splines in the opening,
obtained on each side.
16
LEGEND
1 Handle
2 Load port
3 Roll
4 Elastic split pin
– Carry out the same operation to fix the
back lower board (4).
– The protection deflector (5) is fixed to
the control board (6) with three self-
threading screws.
Fix the board by means of the pressure
stakes.
Then unwind the capillary of the thermo-
meter and introduce it in the left sheath
of the posterior head, introducing the
contact spring.
The right sheath can be needed for the
check thermometer.
– Fix the cover (7) at the lateral sides of the
boiler.
NOTE: Keep the "Test certification" toge-
ther with the boiler documents in the
combustion chamber.
2.7
DRAUGHT REGULATOR
The boilers "SOLIDA" can assemble indif-
ferently 2 types of thermostatic regulators.
NOTA: In order to fix the lever with the
chainlet in the regulator holder it is
necessary to remove the deflector in alu-
minum, which is assembled on the control
board, by unscrewing the three screws
that fix it. (fig. 6)
LEGEND
1 Left side
2 Right side
3 Posterior superior board
Fig. 4
LEGEND
1 Screw with knob M10 x 70
2 Blind nut with cap
3 Blast gate damper
Replace the protection deflector after the
assembling and related adjustment.
2.7.1
"THERMOMAT RT-C" Regulator
The "Thermomat" regulator is equipped
with a thermosetting resin knob of an
adjustment field from 30 to 100 °C (fig. 7).
Screw the regulator on the 3/4" opening
of the anterior head and orientate the red
index on the upper part.
The lever with the chainlet should be intro-
duced in the regulator holder after having
assembled the instrument holder board
and after having removed the plastic lock.
If the joint is taken out, which fixes the
lever with the chainlet, take care in assem-
bling it again in the same position.
After having placed the knob at 60°C, block
the lever with the chainlet in a slightly
inclined position downwards, so that the
4 Posterior inferior board
5 Protection deflector
6 Control board
7 Cover
Fig. 5
Fig. 6

Publicité

loading

Ce manuel est également adapté pour:

Solida 4Solida 5Solida 6Solida 7Solida 8