This solution must be communicated to the owner of the plant so that all parties can
be informed.
The initial safety controls envision:
• draining the condensers: this operation must be performed safely to prevent the
possible formation of sparks;
• no exposure of components and electric wiring to voltages during loading, repair
or purification of the system;
• the continuity of the earth.
l. Repair interventions of the hermetic components
• During the repair of hermetic components, all electric power supply lines must
be disconnected from the appliance running, before the eventual removal of the
hermetic covers, etc.
Whenever it is absolutely necessary to have electric power supply for the unit
during maintenance, a constantly active leak detector must be positioned in the
most critical point in order to signal a potentially dangerous situation.
• Particular attention must be paid to the following to guarantee that, in the case of
intervention on electric components, the housing is not altered in a way to affect
the level of protection.
This includes damage to cables, excessive number of connections, terminals not
manufactured in compliance with original specifications, damage to the gaskets,
incorrect installation of the closing devices, etc.
• Make sure that the appliances are mounted securely.
• Make sure that the gaskets or sealing materials have not deteriorated to the point
that they cannot be used to prevent the entry of inflammable atmospheres. The
spare components must be compliant with manufacturer specifications.
The use of silicone-based sealants can inhibit the efficacy of some types of
leak detection equipment.
Intrinsically safe components do not have to be isolated before working on
them.
2.3 - DATA TABLE
According to configuration of the unit, the data given in the table on page 15 must be checked.
2.4 - SELECTION OF POSITION OF THE INSIDE UNIT
To obtain the best operating performance and prevent faults or hazardous conditions, the position of indoor
unit installation must meet the following requirements:
a. Do not expose the indoor unit to heat or steam.
b. Make sure that the space to the right and left is at least 120 mm and space above the unit is at least 150
mm. (figure 1).
c. The indoor unit must be installed at a minimum height of 2 metres and maximum of 3 metres from the
floor.
d. The wall where the indoor unit is to be fixed, must be stable, strong and suitable to support the weight.
EN - 17