Télécharger Imprimer la page

ETNA T1024ZT Notice D'utilisation page 20

Publicité

Les langues disponibles

Les langues disponibles

Building-in
1. Make a hole in the side of the kitchen
cabinet to enable the gas pipe to be passed
through.
2. Stick the strips of sealant to the underside of
the hob.
3. Place the appliance in the cut-out.
4. Secure the appliance in position.
5. Make the gas connection. Check the gas
connections with a soap/water mixture
(see "Gas Connection").
securing the front and rear
6. Put the plug in the socket
(see "Electrical Connection").
7. Test to check the appliance is operational.
The building in of the hob in combination with
a built-in oven is described in the installation
guide for the oven.
Attention!
The underside of this built-in hob becomes

hot. Take care that you do not place any
flammable or plastic objects in any drawer
under the appliance.

Publicité

loading

Ce manuel est également adapté pour:

T1025zt