Télécharger Imprimer la page

Vetus BOW9512C Manuel D'utilisation Et Instructions D'installation page 13

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
4 .3
Final assembly
• Grease the propeller shaft with 'outboard gear grease' and install
the propeller.
1
2
The propeller should run a minimum of 1 .5 mm (
thrust tube wall, all round .
• Slide the flexible coupling onto the output spindle of the electric
motor as far as necessary to allow the end of the output spindle
(A) and the underside of the flange (B) to become aligned.
• Tighten the lock­screw (C).
• Grease the input shaft with an installation compound, like 'Mo­
lykote® G­n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease' and install the electric motor to the intermediate flange.
• For a first check, turn the propeller by hand, it should turn easily,
whilst being connected to the output spindle of the electric mo­
tor.
vetus® Operation manual and installation instructions bow thrusters BOW9512C and BOW9524C
Outboard Gear
Grease
3
1
/
") free of the
16
4
Outboard Gear
Molykote® G-n plus
ENGLISH
5
Grease
13
020526.06

Publicité

loading

Ce manuel est également adapté pour:

Bow9524c