3-5. Installing Voltage Sensing Lead And Motor Start Control Adjustment
Front
8
For CC operation, connect
voltage sensing lead to
workpiece.
Work
Tools Needed:
1/4 in.
1
2
3
4
10
6
7
9
.
Contactor cord only
on standard model.
1
2
3
4
CV
CC
Internal (INT) and external (EXT)
INT.
EXT.
are stamped on PC1 just above
RC3. Unit is shipped with jumper
plug in internal (INT) position.
1
2
3
To install voltage sensing lead,
proceed as follows:
5
6
Connect ring terminal on end of
cord using screw in clamp. Crimp
clamp tabs around cord.
7
Slide strain
approximately 6 in (152 mm) from
cord end.
Remove upper hole plug from rear
panel.
Insert cord into opening in rear
panel, and secure strain relief into
opening.
8
Connect voltage sensing lead to
terminal strip 1TK at lead 42.
5
9
For constant current welding
(CC), place jumper plug in the
EXT position. Connect voltage
sensing lead to workpiece.
For constant voltage welding (CV),
place jumper plug in the INT
position. Do not install voltage
sensing lead.
10 Potentiometer R70
To adjust motor ramp speed,
remove protective cap (if present),
and adjust potentiometer R70 using
a small nonconductive screwdriver.
Rotating R70 clockwise increases
the time it takes the motor to ramp
up to speed.
Reinstall wrapper.
Rear View
Center Baffle
Circuit Board PC1
Jumper Plug
Receptacle RC3
Clamp
Cord
Strain Relief
relief
onto
cord
Terminal Strip 1T
Voltage Sensing Lead
150 035-B / Ref. 143 328-K / 149 920-B
OM-1078 Page 13