Installation Of Your Brewer - FLAVIA Creation 200 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION OF YOUR FLAVIA® BREWER
Brewer Dimensions
Height – 15.5" (394mm)
A gap of 2.5" (60mm) is required behind the Brewer if it is to be plumbed in.
Electrical Supply
It is important that you have a power supply ready so that we can install your new system quickly and
efficiently.
You will need to supply a suitable switched electrical supply to meet the requirements for isolation of
electrical equipment.
i.e. A 15 Ampere requires a 15 Ampere switched socket or a lockable isolator
Only use a 120V AC 60Hz single phase power supply.
Use only one system per socket and ensure it is earthed.
Your system comes supplied with a mains lead, 6' (1.82m) in length. Only this lead should be used, no
old leads should be re-used.
Notice
• If you are unsure about any installation requirements, consult an electrician and/or a plumber.
Plumbed Systems
A plumbed system will need a mains drinking water supply.
Brewer to be connected to cold water supply only.
Water pressure must be between a maximum of 0.7 MPa (7 bar, 100 psi) and a minimum of 0.1 Mpa (1
bar, 14.5 psi).
Flow Rate to be at least 8.45oz/minute
Using the brass elbow supplied with your Brewer, connect your Brewer to the cold water supply with a
suitable 1/4" diameter water pipe.
Notice
• Do not use water that has come from a water softener or contains sodium.
• Install in accordance with local plumbing regulations.
• Jointing compound should not be used in the water supply to the system, as this will affect the
drink flavour, only use PTFE tape.
• Do not locate the water supply above the mains power socket.
• System should be installed with supplied internal water filter
Installing
Please contact customer service or your local FLAVIA® supplier for your Brewer to be installed.
Width – 9.5" (241mm)
17
Depth – 15.5" (394mm)

Publicité

Table des Matières
loading

Table des Matières