Télécharger Imprimer la page

Allmatic MOVEO 700 24V Mode D'emploi page 10

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
BASE PLATE INSTALLATION
1. Push the achors until they are 90° as shown in the picture
2. Insert the 4 screws (supplied) as shown in the image, from the bottom to the top of the backing plate
3. Screw completely the 4 nuts (supplied) as shown in the image
4. Position the backing plate with the tightened screws and nuts on the concrete foundation (wet cement)
5. Wait for the necessary time (2-3 weeks)
6. Unscrew the nuts previously tightened from the 4 screws
7. Proceed with the positioning and fixing of the MOVEO geoarmotor (use the same nuts previously used)
Plan for one or more sheathing for the passage of the power lines.
Note: It is necessary to know the rack dimensions to can calculate exactly the counter-plate positioning (Fig. 4).
h1 93 mm
h2 2 mm (backing plate thikness)
d1 0 ÷ 10 mm
10 / 40
Fig. 3
6-1624870
Fig. 2
Fig. 4
rev.5
13/09/2022

Publicité

loading

Ce manuel est également adapté pour:

Moveo 600Moveo serieBios1Bios1 120Bios1 24