STEP 1
Lay two frames (1) on the ground in the
positions as shown.
Insert one end A of frame (1) into the end
B of the other frame (1).
Repeat this step until the six frame sec-
tions are connected as shown.
Note: Make sure the frame is turned
so the big-diameter tube is facing the
ground.
STEP 2
Insert leg (3) into big diameter tube of
frame (1), then tighten with one self-tap-
ping screw (11) by tool.
Repeat this step to assemble the remaining
legs (3) to the frame (1) in same manner.
Small diameter tube
1
Rohr mit kleinem Durchmesser
Buis met kleine diameter
Tube de petit diamètre
1
A
Big diameter tube
Rohr mit großem Durchmesser
Buis met grote diameter
Tube de grand diamètre
Big diameter tube
Rohr mit großem Durchmesser
Buis met grote diameter
Tube de grand diamètre
2
tool
Fastening the Self-tapping screw(11) by tool(#).
Anziehen der Schneidschraube (11) mit dem Werkzeug(#).
Vastdraaien van de zelftappende schroef (11) met het gereedschap (#).
Serrer la vis auto taraudeuse (11) avec l'outille.
1
B
1
Big diameter tube
Rohr mit großem Durchmesser
Buis met grote diameter
Tube de grand diamètre
3
11
15