Télécharger Imprimer la page

ESAB MobileFeed 301 AVS Manuel D'instructions page 10

Masquer les pouces Voir aussi pour MobileFeed 301 AVS:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 70
4 INSTALLATION
4.3
Installing drive rolls and guide tubes
CAUTION!
Turn off the power source and the wire feeder.
1. Release the pressure roll assembly lever (1) and lift the pressure roll assembly (2) up.
2. Remove the knurled screw (3) while holding the drive roll (4).
3. Check and install the correct guide tubes.
4. Keep or replace the drive roll (4) with the required size, the designation is marked on the
side of the roll facing out.
5. Put the knurled screw (3) back in position on the drive roll (4) and tighten it.
6. Thread the wire and fasten the pressure roll assembly (2).
4.4
Installing the welding wire
CAUTION!
Turn off the power source and the wire feeder.
0558 012 634
All manuals and user guides at all-guides.com
- 10 -
© ESAB AB 2015

Publicité

loading