Télécharger Imprimer la page

SystemAir Fantech PBW Serie Instructions D'installation, De Fonctionnement Et De Maintenance page 5

Publicité

Electrical Connection
1. Remove the screws securing the terminal box
cover located on the fan motor mounting bracket.
All fan motor and capacitor connections are pre-
wired to an electrical terminal strip. A 3/8"
romex type cable restraint connector will be
needed to secure the wiring through the knockout
on the side of the terminal box.
FD 60EM Count-down Timer w/PBW110
Ground
Neutral
Ground
Neutral
120V AC
Line
Supply
Notes:
1. Order for wires on terminal block may not be as shown
2. Connect Neutral, Line and GRD (if required) to motor colors as shown
3. Cap off Red/Yellow wire on each switch
Troubleshooting
If fan fails to operate, please check the following:
1. Consult wiring diagrams (above) to ensure proper connection.
2. Check motor lead wiring, capacitor leads and incoming supply leads to
insure definite contact.
3. If possible, use a meter to test for continuity across the fan motor leads.
In order to do this, the capacitor must be disconnected (do not test the
capacitor - it will not meter continuity). If motor leads show continuity,
consult factory for a replacement capacitor.
2. Bring incoming electrical service through the
romex connector and the fan electrical service
opening. Be sure to place the connector nut over
the wiring coming into the terminal box. There
are two open ports on the terminal strip. Using a
small regular screwdriver, tighten the neutral
(white) wire of the incoming supply under the
open terminal strip port labeled "N". Tighten the
line (black) wire of the incoming supply under the
open terminal strip port labeled "L" to the ground
connection on the terminal block.
Terminal
Block on
Green/
Fan
Yellow
Blue
Black
Line
Fan Motor
Brown
Capacitor
Timer 1
FD 60EM
Black
60M
White
30M
Green/Yellow
20M
10M
Black
3. Secure the romex connector. Secure the
incoming supply with the romex connector. Place
the capacitor back into the terminal box. Replace
the fan terminal box cover. All fan motor and
capacitor connections have been pre-wired from
the factory. No additional fan wiring is necessary.
DHS 05 Humidity Sensor w/PBW110
Ground (Green)
Neutral (White)
Ground
Neutral
120V AC
Line
Supply
Maintenance Instructions
Since fan bearings are sealed and provided with an internal lubricating mate-
rial, no additional lubrication is necessary.
Terminal
Block on
Green/
Fan
Yellow
Blue
Fan Motor
Black
Line (Black)
Brown
Capacitor
Sensor 1
DHS 05
Black
White
or
Green / Ground
Green /
Black
Ground
5
fantech

Publicité

loading