Télécharger Imprimer la page

Enerpac ATP-1500 Manuel D'instructions page 5

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
4.4 Pump Priming (air bleeding)
IMPORTANT: New pumps MUST be primed BEFORE initial start-
up. Perform priming procedure as described in the following
steps. Refer to figures 4 through 7.
1.
Be sure that hydraulic reservoir is filled with the correct oil
and that reservoir outlet valve is open. Refer to Section 4.1.
2.
Be sure that the air-shutoff valve is in the CLOSED position
and that the oil return-to-tank valve is open.
3.
Loosen the reservoir filler cap about one-half turn to provide
air venting. Venting is required for proper operation.
CLOSED
(pump off)
Figure 4, Air-Shutoff Valve
CLOSED
(oil flow to tool)
Figure 5, Oil Return-to-Tank Valve
OPEN
(pump on)
OPEN
(pressure release
to tank)
4.
Connect air supply hose to the pump air inlet connection.
5.
While air-shutoff valve remains CLOSED, activate air
source and check the air pressure gauge. If any pressure is
indicated, turn air pressure regulator knob counter-clockwise
as required, until gauge indicates zero [0] psi/bar.
Figure 6, Air Pressure Gauge and Regulator
6.
Connect one end of a 3 foot [1 m] long hydraulic hose to the
pump oil outlet connection.
7.
Install an open-ended quick disconnect fitting on other end
of hose.
8.
Unscrew the reservoir filler cap. Place hose end with open-
ended fitting inside reservoir. This will allow oil return during
priming.
9.
Close the oil return-to-tank valve. Move the air-shutoff valve
to the OPEN position.
10. Using the air pressure regulator, SLOWLY increase air
pressure from 0 psi to 10-15 psi [0,68 - 1,0 bar] to start
pump operation.
11. Verify that oil is returning to the reservoir through the hose.
Increase air pressure to 40 psi [2,75 bar] until all air is purged
from the system (no bubbles visible in return oil stream).
12. Move the air-shutoff valve back to the CLOSED position.
The pump will stop.
13. Turn the air pressure regulator knob counter-clockwise until
zero [0] psi/bar is indicated on the air pressure gauge.
14. Open the oil return-to-tank valve to relieve any residual
hydraulic pressure. Verify that hydraulic pressure gauge
indicates zero [0] psi/bar.
.
Figure 7, Hydraulic Pressure Gauge
15. Remove the 3 foot [1 m] long oil return hose from the
reservoir. Reinstall the reservoir filler cap.
16. Disconnect the oil return hose from the pump oil outlet
connection.
5
+
• Pull up to turn.
• Push down to lock.

Publicité

loading