VENT INFORMATION
Begin the vent system installation by identifying the path the vent
will take from the fireplace to the power-vent. Verify clearances are
met throughout the entire path of the venting system.
Determine how the vent system will be terminated, (vertically or
horizontally). Verify clearances for the termination.
NOTICE: If terminated vertically, DVKCVP (Vertical Conversion
Kit) is required.
NOTICE: This Power-Vent can only be used with DuraVent Direct
Vent Pro
4 X 6-5/8 inch piping.
®
NOTICE: All outer connection joints must be sealed with aluminum
tape or silicone sealant rated above 300°F/149°C. The inner flue
joints do not require any sealant.
THIS POWER VENT CAN BE ROUTED IN ANY PATH AS
LONG AS IT MEETS THE FOLLOWING REQUIREMENTS:
•
Maximum vertical distance above Fireplace floor=50 ft
•
Maximum effective length = 50 ft (effective length calculations
shown below in Equation 1).
•
Minimum effective length = 10 ft for Natural and 15 ft for
Propane
– The fireplace damper door fully open for any run less than
25 ft.
•
Maximum 6-90° elbows or 12-45° elbows
•
Maximum 5 ft below the base of the fireplace
•
Maximum drop of 12 ft from highest point in run.
•
If vent pipe runs downward it cannot turn back upward.
1.
Remove the rear panel and flue box of the Power-Vent by
removing the six #10-24 X 3/8-inch screws shown in Figure
39 below.
43902-0-1021
POWER VENT
Figure 39
2.
Insert a strain relief bushing through the 7/8 inch hole on
the rear panel and insert minimum 18 gauge wiring (field
supplied). See Figure 40 below.
3.
Attach #10 ring terminal to the ground wire. Remove the
top #10 X 1/2 inch screw on the front of the flue box and
attach the green/yellow wire from the inducer motor and the
ground wire from the power supply with the screw as shown
in Figure 41 below.
4.
Re-attach the rear panel and flue box to the Power-Vent outer
box with six #10 X 3/8 inch screws.
Figure 40
Figure 41
Page 27