Télécharger Imprimer la page

Empire Comfort Systems DVCTL60CFP95N Instructions D'installation page 23

Publicité

Les langues disponibles

Les langues disponibles

FRAMING
HEADER
21"
When finishing the fireplace never obstruct or modify the
gap around the glass frame in any manner. Provide adequate
clearances around air openings into the combustion chamber.
43902-0-1021
INSTALLATION (CONT'D)
FOR 1/2"
DRYWALL
FOR 5/8"
DRYWALL
Figure 32
FLUSH WALL INSTALLATION
FINISHED WALL
NON-COMBUSTIBLE
BOARD
Figure 34
WARNING
NAILING FLANGES
FOR 1/2" DRYWALL
FOR 5/8" DRYWALL
NONCOMBUSTIBLE
BOARD INSTALLED
OVER APPLIANCE
If the joints between the finished wall and the fireplace surround
(top and sides) are sealed, a 300°F minimum sealant material
must be used. These joints are not required to be sealed. Only
non-combustible material (using 300°F minimum adhesive if
needed) can be applied as facing to the fireplace surround.
NAILING
FLANGES
SECURED
IN PLACE
Figure 33
FINISHED
WALL
Figure 35
CAUTION
Page 23

Publicité

loading