Installation SU906
Before installing the appliance, make sure
that none of the parts is damaged in any
way. In case of damaged parts, contact your
retailer and do not proceed with installation.
Read all of the following instructions with
care before installing the appliance.
The LED bar of the range hood are supplied
in the packaging and you need to assemble
them at the end of the installation.
Before installing the appliance, remove the
metal grease filter and the oil collector. The-
se filters could be removed by pushing the
handles towards the back side of the cooker
hood and turning it downwards to unfasten it
from its slot. (Fig.1).
To remove the oil collector, loosen the two
screws as indicated in Fig. 1/A.
To install the appliance please respect the
following instructions.
The appliance must be installed by autho-
rised personnel. In order to do not damage
the electronic parts of the appliance please
do not use additional screws.
Essential precautions to respect before in-
stalling the appliance are the following:
- Prepare the power supply.
- Prepare a hole for the exhaust of the air
both in the filtering and in the exhausting
version.
- Use an exhausting pipe whose maximum
length does not exceed 5 meters.
- Do not use screws to fix the outlet pipe to
the cooker hoods.
- Limit the no. of elbows in the piping , since
each elbow reduces the aspiration efficiency
of 1 linear meter. (Ex.: if you use no. 2 x 90 °
elbows, the length of piping must not exceed
3 meters).
- Avoid abrupt direction changes.
I N S TA L L ATIO N
12
- Use a 150 mm or 200 mm constant diame-
ter pipe for the whole length.
- Use piping approved by standards in force.
- In the units equipped with 2 motors please
use a 200mm constant diameter pipe for the
whole length
Make a cut-out on the bottom of the cabinet
which is suitable to hold the appliance in po-
sition (Fig. 2)
SU906 (520mm) 501 X 265mm - 19"
SU906 (850mm) 835 X 265mm - 32"
SU906 (27") 670 X 265mm - 26"
After drilling the kitchen cabinet having fol-
lowed carefully the instructions above, ca-
librate the fixing spring depending on the
depth of the cabinet. (Pic. 3).
If the range hood has a single motor, the
pipe diameter must be 150mm. Otherwise
if the range hood has two motors, the pipe
diameter must be 200mm.
At this point, insert the range hood inside the
kitchen cabinet until the fixed springs will be
hooked into.
Fix the range hood to the cabinet, in the front
and rear sides, using the screws equipped.
To fix the hood on the rear side apply the
screws on the holes of oil container as on pics
indicated and fasten the screws (Fig. 4 - 5).
When the screws have been fastened, take
the LED bar and connect the two pin con-
nectors (Fig. 6).
Insert the LED bar on the appropriate hole
until it will be hooked into (Fig. 7).
At this point take the oil collector and hook
it on the appropriate hole of the hood. Plea-
se be careful not to scratch and damage the
product. (Fig. 8).
Fix the oil collector securing the pommels of
the range hood (Fig. 9).
At the end, place the grease filters that were
removed before (Fig. 10).
X 10"
23/32
14/32
X 10"
14/16
14/32
X 10"
3/8
14/32