Attach to extension using
wire tie. Use hole closest
to OUTSIDE edge and on
NON-APPROACH side.
3/8"-16NC x 3/4" HHCS
and Flanged Locknut
12. Locking Latch Cable
A) Install latch cable sheave and retaining rings in upper
slot of power unit column as shown, Fig. 11c.
B) Slip loop end of cable over end of shoulder screw on
right side latch control plate, Fig. 11c.
C) Feed the other end of the cable through the latch cable
sheave slot making sure that the cable is running
under the bottom side of the latch cable sheave and
inside the right column, Fig. 11c.
D) Attach latch cable conduit guide brackets to overhead
as shown, Fig. 11a & Fig. 11b. Always use the holes on
the approach side of the lift. HHCS should be in hole
nearest the center of the overhead, Fig. 11b.
E) Route cable up inside column and through the latch
cable guide, Fig. 11a & Fig. 12.
IMPORTANT Using wire ties provided, tie off cable guide
to column extension as shown, Fig. 11a. Guide must
be attached in hole closest to the outside edge of the
column on the NON-APPROACH side.
F) Continue routing cable to the left column latch cable
guide, Fig. 11a & Fig. 12, routing the cable through the
left column latch cable guide, Fig. 11a.
Attach Hose Clamps Here
Attach Latch Cable Conduit
Guide Bracket Here. Always
use two holes on approach
side of extension to attach bracket.
All manuals and user guides at all-guides.com
3/8"-16NC x 3/4" HHCS
and Flanged Locknut
Latch cable runs
along approach
side of overhead
1/4"-20NC x 1" HHCS
and Flanged Locknut
Cable Guide
runs UNDER
hydraulic hose
Fig. 11a
12
IMPORTANT Using wire ties provided, tie off
cable guide to column extension as shown,
Fig. 11a. Guide must be attached in hole
closest to the outside edge of the column on
the NON-APPROACH side.
G) Bring the cable down inside the left column
and feed the end of the cable through the
lower latch cable sheave slot so that the
cable is now back outside the column, Fig.
13.
H) Install latch cable sheave and retaining
rings in lower slot of non-power unit column
as shown, Fig. 13.
I)
Route cable under the bottom side of the
latch cable sheave, Fig. 13.
J) At this point you MUST install the latch
handle, jam nut, and right column latch
cover Fig. 11c & Fig. 14. Install latch handle
ball, Fig. 14.
Latch Cable Sheave
(2) 3/8" Retaining Rings
Shoulder Bolt
(3) 3/8" Flat Washers
Slot Cover
Always put HHCS through hole
closest to center of overhead.
Install Latch Handle using a 3/8"
hex jam nut to lock in place. Then
install flat washers and slot cover.
Fig. 11b