Télécharger Imprimer la page

Rotary 500 Serie Instructions D'installation page 11

Masquer les pouces Voir aussi pour 500 Serie:

Publicité

Les langues disponibles

Les langues disponibles

NOTE: Overhead hose crosses and runs down
approach side of left column to cylinder.
#
6
6
#
Hose runs down
approach side to
3
cylinder on left column.
6
*
Cylinder bleeders
Torque values
15 ft. lbs. Minimum
20 ft. lbs. Maximum
4
5
*
1
2
*
5
FRONT
ITEM
QTY.
DESCRIPTION
1
2
Hydraulic Cylinder
2
1
Power Unit Hose
3
1
Overhead Hose
4
1
Branch Tee
5
2
Metal Hose Clips
6
8
Plastic Hose Clips
*6
3/8-16NC x 3/4" lg. Carriage Bolts
*6
3/8"-16NC Flanged Locknuts
#4
3/8-16NC x 3/4" lg. Flanged HHCS
#4
3/8"-16NC Flanged Locknuts
Attach hose to column
using 3/8"-16NC x 3/4"
Carriage Bolts, Flanged
Locknuts, and Hose Clips
Sheave Cover
All manuals and user guides at all-guides.com
#
#
3
*
*
1
Fig. 9a
*
Fig. 9b
Upper Sheaves
2nd Cable
Lower Sheaves
Upper Cable Tie Off
& 5/8" Nylon Insert
Locknut
Lower Cable Tie Off
& 5/8" Nylon Insert
Locknut
3/4"(19mm)
SCHEDULE 80
steel pipe spacer
for Low Ceiling
11
1st Cable
Fig. 10a
To set up cables for a low
ceiling(LC), use 3/4" SCH
80 steel pipe spacers (not
included) at the lower
cable tie off. The lengths
required are as follows:
4" Lower Height = 8"
(203mm) long pipe
8-1/2" Lower Height = 17"
(432mm) long pipe
Fig. 10b

Publicité

loading