Télécharger Imprimer la page

Rinnai E75CN Instructions D'installation Et De Service page 50

Publicité

i
NOTICE
Water pressure is too low (<10 PSI), FILL
indication remains continuously visible,
the boiler is taken out of operation. The
installation needs to be topped off.
9.3 Hot water supply
50
All manuals and user guides at all-guides.com
It can take a while before all air has disappeared from a filled installation.
Especially in the first week noises may be heard which indicate the presence
of air. The automatic air vent in the boiler will remove this air, which means
the water pressure can reduce during this period and therefore topping off
with water will have to be done.
During normal use the following messages can occur with the necessary follow up:
Water pressure is too low (<14,5 PSI),
flashing FILL will alternate with indication
of water pressure, boiler power of 50%
is possible. The installation needs to be
topped off.
Apply the water pipe pressure to the DHW fascility (open main valve and/or stop
valve of the safety group).
Vent the DHW fascility and the hot water installation by opening a hot water shut off
valve. Leave the shut off valve open for as long as required until all air has disappeared
from the DHW fascility and the pipes and only water is flowing from the shut off valve.
Water pressure is too high (>52,2 PSI),
if HIGH indication remains continuously
visible, the boiler is taken out of operation.
The installation pressure needs to be
decreased by draining water.

Publicité

loading

Ce manuel est également adapté pour:

E110cnE75cpE110cp