Télécharger Imprimer la page

Rinnai E75CN Instructions D'installation Et De Service page 15

Publicité

5.3.2
Clearances from boiler
ceiling
Min. 10" /
250mm
service clearances to the boiler
Minimum required clearances
to combustibles
Top of boiler
Back of boiler
Front of boiler
Left side of boiler
Right side of boiler
Floor / Ground
Vent
clearances to the boiler
For closet installation: clearance is 1" / 25mm from the front.
Low Loss Header
Clearances to combustible and non-Combustible is 0 inch for sides, top, front and floor/ground
All manuals and user guides at all-guides.com
15.7"
24"
400
600
Minimum required clearances
All types
inch / mm
2" / 50
0"
6" / 150
2" / 50
2" / 50
12" / 300
0"
2"
50
to non-combustibles
All types
inch / mm
2" / 50
0"
6" / 150
2" / 50
2" / 50
12" / 300
0"
0.4"
10
figure 4
Recommended
service clearances
All types
inch / mm
10" / 250
0
24" / 600
2" / 50
2" / 50
30" / 762
0"
table 3
15

Publicité

loading

Ce manuel est également adapté pour:

E110cnE75cpE110cp