Télécharger Imprimer la page

Roche Bobois LIFT Notice De Montage Et D'entretien page 15

Buffet

Publicité

Les langues disponibles

Les langues disponibles

LIFT
- Buffet - Sideboard - Aparador
design Sacha Lakic
12. You may need a number of tries before the final clamp. Make sure that the adjustment of the gaps
between the corpus and the mobile part is perfect. Do the final clamp only after having checked
the perfect adjustment.
13. Fix the superior top with the 10 screws (fig.6)
6. BENDING CORRECTION OF THE TOP TRAY OF THE MOBILE ELEMENT
1. Rise the mobile element around 25cm with the remote control
2. Unscrew partially with the ALLEN key n° 2.5, th e 10 screws of the tray without removing them
3. Introduce the Key n° 4 in the visible holes at ea ch side of the tray: stretch or lighten turning the key
4. Screw again with the ALLEN key n° 2.5, the 10 scr ews of the tray
7. BENDING CORRECTION OF THE FRONT OR THE BACK OF THE SIDEBOARD
The idlers are located at the top of the front and of the back, 2 covers at each extremity provide access to
the idlers.
1. Rise the lift around 25cm to access to the covers of the idlers
2. Press to the bottom of the cover to pull it out
3. Introduce the key n° 2.5 in the visible hole, str etch or lighten turning the key towards the top or
the bottom.
1. Put again the cover on at the end of the operation.
Fig. 6
7
Fig 7

Publicité

loading