Installing Outdoor Unit; Drain Work - mundoclima MUCSR-24-H8 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 79
INSTALLATION MANUAL
2.3 Installation guidelines
Individual installation
Note: The distances indicated are the minimum.
Multiple installation
H
Note: The distances indicated are the minimum.
The relations between H, A and L are as follows:
L
L ≤ 1/2H
L ≤ H
1/2H < L ≤ H
L > H
Can not be installed
A
25cm or more
30cm or more
2.4 Outdoor unit installation

1) Installing outdoor unit

When installing the outdoor unit, refer to "Precautions for
selecting the location" .
Check the strength and level of the installation ground so that
the unit will not cause any operating vibration or noise after
installed.
Fix the unit securely by means of the foundation bolts.
(Prepare 4 sets of M8 or M10 foundation bolts, nuts and
washers each which are available on the market.)
L

2) Drain work

If drain work is necessary, follow the procedures below.
Use drain plug for drainage.
If the drain port is covered by a mounting base or floor surface,
place additional foot bases of at least 30mm in height under the
outdoor unit s feet.
'
In cold areas, do not use a drain hose with the outdoor unit.
(Otherwise, drain water may freeze, impairing heating
performance.)
Bottom frame
52
Fix with bolts
Drain port
Seal
Drain plug
Hose

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mucsr-30-h8Mucsr-36-h8Mucsr-48-h8Mucsr-48-h8tMucsr-60-h8t

Table des Matières