6
Description of connections
• remove the two screws A and lift the cover (detail B);
• BH30: push the cover in from the side, then lift it up (detail B).
• remove the two screws A;
• push the cover in from the side, then lift it up (detail B).
• turn the cover around by 180° (detail C) and set it down in front of the automation system. Warning! Lift the cover
slowly and carefully to prevent damaging the wires.
Figure 3-4-5-6-7-8 shows connection diagrams for connecting mains voltage to the motor control unit (B70/1DC)
6.1
Typical installation
2
7
1
8
It is the installer's responsibility to verify the adequacy of the cables in relation to the devices used in the
installation and their technical characteristics.
1
Power supply
2
Photocell - Receiver F4ES/F4S
3
Photocell - Transmitter F4ES/F4S
LED Flashing light R92/LED24 - FIFTHY/24
4
Power supply 24V dc
5
Antenna
Key selector R85/60
Key pad H85/TTD - H85/TDS
(connecting to H85/DEC - H85/DEC2)
6
H85/DEC - H85/DEC2
(connecting to control unit)
Gate open indicator
7
Power supply 24V DC 3W max
Courtesy light (Potential free contact)
8
Power supply 230 Vac (100 W max)
SUGGESTIONS: with existing installations, we recommend checking the cross section of the cables and that
the cables themselves are in good condition.
B71/BC (BH30 Series only) is installed:
5
4
3
Recommended cable
H07RN-F 3x1,5 mm
double insulated cable
2
Cable 5x0,5 mm
(max 20 m)
2
Cable 3x0,5 mm
(max 20 m)
2
Cable 2x1 mm
(max 10 m)
2
Cable 50 Ohm RG58 (max 10 m)
Cable 3x0,5 mm
(max 20 m)
2
Cable 2x0,5 mm
(max 30 m)
2
Cable 4x0,5 mm
(max 20 m)
2
The number of conductors increases when using more than
one output contact on H85/DEC - H85/DEC2
Cable 2x0,5 mm
(max 20 m)
2
Cable 2x1 mm
(max 20 m)
2
.
6
2
3
63