ZEPHYRONLINE.COM
Rectangular Horizontal Ducting Preparation
By default the Typhoon and Hurricane are pre-configured for 7" round vertical ducting.
By default the Cyclone is pre-configured for 6" round vertical ducting.
Typhoon, Hurricane, & Cyclone Use, Care, and Installation Guide
Installation Instructions
1. Using a Philips-head screwdriver
remove the screws and round vertical
transition adapter from the top of the
hood.
2. Using a Philips-head screwdriver,
remove the screws and 3-1/4"x10"
rectangular cover plate from back of
hood.
3. Typhoon ONLY. Remove the two
plastic air diverter blocks. The blocks
are located in the hood and can be
accessed from the top when the round
transition adapter is removed.
17