Horizontal Ducting Preparation - Zephyr Monsoon I Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

AK9228AS and AK9234AS Models Only
10. (Rectangular Ducting) From inside the liner,
push 3-1/4" x 10" rectangular adaptor through
the back knock-out and secure to interior back
11.
3/16" x 3/8" screws previously removed from
13. Secure blower to captive nuts on interior
aluminum duct tape. Plug in blower molex
plug.
10. (Round Ducting) From inside the liner, push
8" round adaptor through the back knock-out
M4 x 6mm screws.
12. Position blower inside liner body as shown by:
1) Rest the bottom horizontal ducting bracket
on the two support clips located on the interior
back wall of the liner. 2) Pivot top horizontal
ducting bracket to meet captive nuts on interior
back wall.
Horizontal ducting preparation is now
complete. Refer to Page 10, Step 5 to
complete installation.
14
www.zephyronline.com
2
1
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ak9228asAk9234asAk9240asAk9246as

Table des Matières