8. Programming the Receiver Operating Frequency
& High Speed Conditioning of Fan Control
IMPORTANT: Ceiling fan blades MUST be installed
before high speed conditioning can begin.
8.1
Within 1 minute of restoring electricity to the ceiling fan,
push and hold the fan OFF button (
to set the code in the receiver. The ceiling fan lights (if
installed) will blink to indicate the transmitted has been
paired with the receiver.
IMPORTANT: Immediately after successful pairing, the
ceiling fan will automatically begin high speed
conditioning of the motor. During conditioning, the
electronic motor control software is calculating
speeds for the 2nd through 5th speed settings based
on the blades that were installed on the fan.
The fan will run for approximately 1 minute in the upward
direction then reverse direction to down flow and run an
additional 1 minute. When conditioning is complete,
the fan will come to complete stop.
INSTRUCTION TO THE USER (if device contains a digital device)
This equipment has been tested and found to comply with the limits for a class B digital device, pursuant to part 15 of the
FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential
installation. This equipment generates, uses and can radiate radio frequency energy and if not installed and used in
accordance with the instructions, may cause harmful interference to radio communications. However, there is no
guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to
radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try
to correct the interference by one or more of the following measures:
• Reorient or relocate the receiving antenna.
• Increase the separation between the equipment and receiver.
• Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
• Consult the dealer or an experienced radio/TV technician for help.
This equipment has been certified to comply with the limits for a class B computing device, pursuant to FCC Rules. In
order to maintain compliance with FCC regulations, shielded cables must be used with this equipment. Operation with
non-approved equipment or unshielded cables is likely to result in interference to radio and TV reception. The user is
cautioned that changes and modifications made to the equipment without the approval of manufacturer could void the
user's authority to operate this equipment.
This Class B digital apparatus meets all requirements of the Canadian Interference-Causing Equipment
IMPORTANT: Do not interrupt the conditioning until
the fan comes to a complete stop in approximately
5 minutes. All functions of the control will be rejected
during conditioning.
High speed conditioning is now complete.
8.2
) for 3 to 5 seconds
If programming is unsuccessful, retry the above
instructions after cycling the wall control ON/OFF switch to
restart the 1 minute programming time period.
If still unsuccessful, shut off the electricity at the fuse box or
breaker panel and change the wall control frequency
(page 18). After changing the frequency settings, repeat
instruction 8.1 of this section within one minute of restoring
the electricity.
23
emersonfans.com
Please contact 1-800-654-3545 for further assistance
U.L. Model No.: CF915