Maintenance; Troubleshooting; Decommissioning - ProMinent Dulcotest ICT 1-IMA-1 m Mode D'emploi

Cellule de mesure de conductivité inductive
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Commissioning / Maintenance / Troubleshooting / Decommissioning
ProMinent
®
Select "install. factor setting?" in the setting menu and restore
the installation factor noted earlier.
Next, restore the temperature coefficient α of the water sample
used
It is highly recommended that you check the conductivity of the
calibration solution with suitable reference metering equipment
to be sure that the conductivity of the calibration solution has not
changed due to carry-over of liquid or evaporation.
9

Maintenance

Since it is electrode-free and is designed with good flow charac-
teristics the sensor is very low maintenance.
Remove deposits from the sensor regularly to maintain a reliable
measurement operation.
NOTE
Deposits can be prevented from forming in most cases. Install
the sensor in flowing media and make sure that the sensor tip
is in line with the direction of the flow.
10

Troubleshooting

See Operating instructions of the DULCOMETER
11

Decommissioning

Detach the electrical connection of the sensor from the
®
DULCOMETER
D1C.
®
D1C controller.
39

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dulcotest ict 1-ima-2 m

Table des Matières