Dimensions - Eaton CROUSE-HINDS Champ PFMA Serie Information Sur L'installation Et L'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

DIMENSIONS

With Visor and Guard
Figure 7
Figure 9
VISOR INSTALLATION INSTRUCTIONS
1.
Remove power from floodlight.
2.
Place floodlight face up.
3.
Carefully align visor with four (4) screw holes at the top of the fixture shown in
Figure 9.
4.
Install screws provided with visor, taking care to not scratch the finish of the
floodlight. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install floodlight per above instructions.
NOTE: Visor can be installed before or after floodlight has been in operation.
All manuals and user guides at all-guides.com
With Visor Only
Eaton's Crouse-Hinds Division
1201 Wolf Street, Syracuse, New York 13208 • U.S.A.
Copyright
2019
©
Figure 6
With Guard Only
GUARD INSTALLATION INSTRUCTIONS
1.
Remove power from floodlight.
2.
Place floodlight face up.
3.
Carefully align guard with four (4) screw holes on each side of the fixture shown
in the image above.
4.
Install screws provided with guard, taking care to not scratch the finish of the
floodlight. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install floodlight per above instructions.
NOTE: Guard can be installed before or after floodlight has been in operation.
Figure 8
IF 1891
Revision 2
Revised 09/19
Supersedes 08/19

Publicité

Table des Matières
loading

Table des Matières