Install Ductwork; Measure Installation - Broan BEST K210A Guide D'installation

Masquer les pouces Voir aussi pour BEST K210A:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. INSTALL DUCTWORK

Plan where and how the ductwork will be installed.
Install proper-sized ductwork, elbows and roof or
wall cap for the type of blower you are installing. If
using 7" or 8" round ducts, or 3 1/4'' x 14'' duct, use
a transition. Use 2" duct tape to seal duct joints.
STANDARD INSTALLATION
Roof cap
3 1/4" x 14" to 8"
transition if
3 1/4" x 14" duct
Wall
cap
HH0030A
INSTALLATION WITH 7" OR 8" ROUND DUCT
Roof cap
Wall
cap
HH0031A
INSTALLATION WITH EXTERIOR BLOWER
Exterior blower
HH0032A
3 1/4" x 10" or
3 1/4" x 14" duct
Hood with
interior blower
7" or 8" round duct
3 1/4" x 10" to 7"
or 8" transition
Hood with
interior blower
10" round duct
Hood with
exterior blower

2. MEASURE INSTALLATION

Dimensions for the most common installations are
shown below.
We recommend you to install the hood at a
minimum of 20" from an electric range and
24" from a gas range.
For optimal performance, the hood should not be
installed more than 30" from cooktop.
Cabinets
Hood
Backsplash
(Optional)
HH0033A
Cabinets
Hood
Backsplash
(Optional)
HH0034A
- 4 -
20" minimum
clearance
(24" for gas)
Standard 36" h.
cooktop
30" maximum
clearance
Standard 36" h.
cooktop

Publicité

Table des Matières
loading

Table des Matières