CRZ E-MD04 Manuel Utilisateur page 36

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BEFORE YOU BEGIN
Remove contents from box. Remove the foam separators that protect the components from
damage during shipping. Inspect the contents of the box for scratches in the paint, dents or
kinked cables that may occurr during shipping. Because the product was 85 percent
assembled and packed at the factory, there should not be any problems, even if the box has a
few scars or dents.
MAKE SURE KEY SWITCHES IS TURNED " OFF" BEFORE CONDUCTING ANY
PROCEDURES.
Estimated Assembly and Set-Up Time
We recommend assembly by an adult with experience in motorbike or bicycle mechanics.
Allow up to 30-40 minutes for assembly.
Allow up to 12 hours for initial charge.
Required Tools
Some tools may be supplied; however, we recommend the use of mechanic's grade tools.
Use the supplied tools only as a last resort.
The list of tool required is as follows
·Open end wrench 10mm / 13mm/ 17mm / 22mm
·Allen wrench 5mm / 6mm/ 8mm
Assembly illustration and instruction
ASSEMBLY HANDLEBAR
Caution: Failure to properly adjust and tighten the bolts that affix the handlebar can
cause you lose control and crash.
ASSEMLY MUDGUARD
3. place the handlebar (A) in the bottom
clamp, then cover the upper clamp (B) on
the handlebar and install the 4pcs bolt (C)
4. Place the handlebar in the upright and
vertical position, then tighten all the bolts
securely with 10mm socket spanner.
A:handlebar
B:upper clamp
C:bolt M8X20 4pcs

Publicité

Table des Matières
loading

Table des Matières