Putting Into Operation - Abicor Binzel MB EVO PRO 15 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MB EVO PRO/MB EVO

4 Putting into operation

4.1 Preparing and mounting the wire guide
DANGER
Risk of injury due to unexpected start-up
The following instructions must be adhered to for the entire duration of
maintenance, servicing, disassembly and repair work:
• Switch off the power source and close off the gas supply.
• Close off the compressed-air supply and pull the main plug.
DANGER
Risk of injury and machine damage when handled by
unauthorised persons
Improper repair work and modifications to the product may lead to serious
injuries and damage to the device. The product warranty will be rendered
invalid if the device is handled by unauthorised persons.
• Operating, maintenance, cleaning and repair work may only be carried
out by qualified personnel (in Germany see TRBS 1203).
NOTICE
• Please take note of the following instructions: 3 Product description on
page EN-5
The MIG/MAG manual welding torch is equipped upon delivery. For
information about replacing wear parts, refer to the following chapter:
 8.2 on page EN-15
NOTICE
• Select the proper wire type and the related wire guide for your
application.
• Use insulated liners or PA liners only.
• New still unused spiral liners or PA liners have to be shortened to the
actual length of the cable assembly.
• Liners = for steel and stainless steels
• PA liners = for aluminium, copper, nickel and stainless steels
4 Putting into operation
EN - 7

Publicité

Table des Matières
loading

Table des Matières