Wall Mount Installation - NewAge Products Performance 2.0 Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Option 2
Wall Mount Installation Overview
Plan layout before installing cabinets.
• Determine height cabinets will be
installed off the ground.
• It is recommended to begin
installation with Locker cabinet.
• Install cabinets one at a time.
• Cabinets must be fully secured
to wall using (4) wall screws per
cabinet.
Position and secure remaining base
2
cabinets, and wall cabinets to wall.
See
page 12.
Attach worktop. See
4
instructions.
8
page 17
for full
Begin by attaching Locker cabinet to
1
wall. See
page 12
on hanging cabinets.
Attach cabinets together. See
3
for full instructions
page
15.

Publicité

Table des Matières
loading

Table des Matières