Installation Options - NewAge Products Performance 2.0 Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation options for Cabinets
Important information: Please read
before beginning installation.
Layouts shown are only examples.All
cabinets are mobile and can be configured
in a variety of different layouts.
Plan layout and measure space before
installing.
Locate wall studs prior to installation.
Consider the location of electrical outlets
when planning layout.
Measure height of cabinets for clearence.
Base cabinets can be mounted flush front
or flush back with Locker cabinets.
Option 2.
- see
page 8.
Wall mount cabinets off floor.
Option 4.
- see
page 10
Sets with casters and adjustable leveling legs.
Note: Casters cannot be installed on Locker
cabinets. Casters not included in all sets.
6
Option 1
. - see
page 7.
Floor mount with adjustable levelling legs.
Option 3.
- see
page 9.
Wall mount on slatwall using slatwall
brackets (sold seperately).
Option 5.
- see
page 11
Corner set installation. Note: Corner cabinets
can be installed using all installation options.

Publicité

Table des Matières
loading

Table des Matières