Hanging Wall Cabinets; On Studded Wall - NewAge Products Performance 2.0 Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hanging Cabinets on
Studded Wall
1
Gather parts.
Wall Screw
(1/4" x 2.5")
4 Wall Screws per cabinet
4 Washers per cabinet
Begin by attaching locker to wall. Line up
3
top of cabinet with pencil line(1), and pre-
drill 3/16" (6mm) holes into studs through
holes in cabinet(2). Use wall screws to
secure to wall(3).
1
5
Finish by fastening cabinets together.
See
page 15
for detailed instructions.
12
Wall Washer
(1/4")
2
4 X
per Cabinet
3
4 X
per Cabinet
2
Use stud finder to locate the studs
and mark a line on the wall with a pencil
at desired height.
Attach remaining base cabinets (2),
4
and wall cabinets(3) to wall using same
method as locker cabinet(1)attachment.
1
2
Masonry.
• Follow steps 3 to 5.
• Drill 4 pilot holes through the perforated
strip with hammer drill & masonry bit.
• Use 4 x (2 ¼" x ¼" )Tapcon Concrete
Anchor into wall. (Not Included)
• OR 4 x (#10 x 2" )Screw with 3/16"
masonry plug into wall. (Not Included)
• Follow Step 6.
Note:
Do not load cabinet
without first securing to
the wall.
3
4 X
per Cabinet

Publicité

Table des Matières
loading

Table des Matières