Krick RoMarin FLB 1 Mode D'emploi page 69

Masquer les pouces Voir aussi pour RoMarin FLB 1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

No.
Description
7.17
Ventilation grid
7.18
Checker plate, cover
7.19
Gear motor
7.20
Motor connection cable
7.21
Motor plate
7.22
Base, coupling housing
7.23
Side part, coupling housing
7.24
Rear wall, coupling housing
7.25
Cover, coupling housing
7.26
Coupling hose
7.27
Self-tapping screw
7.28
Handle, companionway
7.29
Screw gear motor
Fig.: Superstructure with mast, lamp post, radar and hose box
Glue the ventilation grids 7.17 on both sides.
If the checker plate imitations are to be used for the deck and superstructure deck, do not glue on the lamp
post and the hose box until after step 8.
Glue the prepared hose box to the superstructure deck.
Position the lamp mast on the superstructure deck and mark the hole for the cables. Drill the hole for the
cables. Then glue the lamp post in place.
Attach the complete radar unit, making sure that the radar antenna can rotate easily.
Status 25. August 2022
Dimesions
Ready made
Plastic
Laser part
Laserpl. corrugated
Ready made
Ready made
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Rubber tube
D 1,2 * 5 * 20
Ready made
D 2,2 * 6,5
Brass wire
D 1 * 20 s. drawing
Ready made
M 1.6
7.17
27
Qty.
2
1
BSR
1
n.e.
1
n.e.
1
1
2
1
1
1
BS
2
BS
1
2
n.e.
5.21-5.24
© Krick Modelltechnik

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ro1091

Table des Matières