Krick RoMarin FLB 1 Mode D'emploi page 59

Masquer les pouces Voir aussi pour RoMarin FLB 1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

In the following step, drill the marked holes. The centres of the holes for the portholes, handrails, railing
supports and the fastening for the fire monitor are marked on the thermoformed part of superstructure 4.1. Drill
these holes as indicated. Pre-drill with a thin drill bit and then drill to size with a conical reamer, e.g. Krick
Order No. 492014 or 492013. These peeling drills prevent the drill from hooking and tearing open the thin
ABS.
D 1
D 9
Fig.: Holes on the superstructure side
D 5
D 1,5
D 2,5
4.1
Fig.: Holes for superstructure deck
4.4
Fig.: Mounting the cover box
Status 25. August 2022
17
© Krick Modelltechnik

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ro1091

Table des Matières